Ørsted Energy Gunfleet Sands Offshore Wind Farm

Renewable Energy

Client / PartnerØrsted Energy
Timescale2003–2013
LocationThames Estuary (7 km off Essex Coast)
SectorRenewable Energy

Project Highlights

  • Supported Gunfleet Sands 1 & 2 (48 turbines, 173 MW) and Gunfleet Sands 3 (two 6 MW demonstration turbines)
  • Authored Written Schemes of Investigation (WSI) and managed curator and stakeholder consultation
  • Interpreted sub-bottom, side-scan, multibeam, and magnetometer surveys to establish Archaeological Exclusion Zones
  • Assessed onshore and offshore vibrocore/borehole sub-samples and delivered construction watching briefs

Maritime Archaeology Ltd supported planning and construction across the Ørsted Energy Gunfleet Sands Offshore Wind Farm developments—located 7 km off the Essex coast (173 MW total capacity across Gunfleet Sands 1 and 2, plus the 2012 Gunfleet Sands 3 demonstration project for two 6 MW turbines).

Appointed following competitive tender, our team produced the Archaeological Written Scheme of Investigation (WSI) and coordinated consultation across statutory heritage curators, academics, and marine contractors. Using sub-bottom, side-scan sonar, multibeam bathymetry, and magnetometry, we mapped previously unknown seabed anomalies and established targeted Archaeological Exclusion Zones.

Alongside palaeoenvironmental and geomorphological assessment of onshore and offshore borehole and vibrocore sub-samples, our archaeologists delivered onshore and offshore construction watching briefs with rapid field deployment capability—ensuring a staged, pre-costed approach that prevented costly construction delays while contributing geoarchaeological data to the public record.